Wuhan Global Metal Engineering Co., Ltd
The pioneer manufacturer of heaters & sensors
Place of Origin: | China |
Brand Name: | GME |
Certification: | ISO9001 |
Model Number: | OEM |
Minimum Order Quantity: | 1000pcs |
---|---|
Packaging Details: | Standard Export Packing |
Delivery Time: | 7-15days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 100000pcs/month |
Material: | Stainless Steel 304 | Wall Thickness: | 0.4mm |
---|---|---|---|
Lengh: | 6mm | Techonlogy: | Deep Drawing |
Surface: | Polishing | OEM: | Yes |
High Light: | thermocouple parts and components,thermocouple assemblies |
Stainless steel round tube temperature sensor house sensor case
1. OEM is accepted
2. Specialty in sencor case product
3. Competitive price, high quality and quick delivery
4. Available to ROHS
Meterial: Steel, Stainless steel, aluminum alloy, red copper, brass, bronze.
Produce process:Stamping, Deep drawning, Welding.
Die and jig: Professional die and jig design by own engineer.
Surface treatment: Professional polishing, plating, anodizing.
Application: Auto parts, Sensor parts, Home appliances parts.
OEM:We can produce parts as customers' required, such as drawing, sample......
RoHS: All the parts we prduced is available to RoHS.
BRAND | GME |
DESIGNING | According to customers drawings or samples |
MOULD | Made by ourself |
MOULD COST | Mould charge is allowed in advance for special parts After certain quantity,the cost will be return back to customer |
SAMPLES | We can provide samples before mass production, generally we need 15days to finish samples. |
MATERIAL | Carbon steel,stainless steel,Aluminum,brass,bronze,copper etc |
SURFACE | Polishing,oxidating,zinc ,nickel plated,powder coating ,chrome plating, electrophoresis, or according to customer required |
PROCESSING | Deep drawing, punching, bending, welding, riveting, etc |
CERTICATES | ISO9001:2008 |
OEM | We have more than 15 yeasr experience in deep drawn, so deep drawn OEM is accepted. |
Packing |
First in plastic bag, then in carton, out side is big carton and pallet Or according to customer request |
Delivery date | Generally, we need 30 days to finish mass production after samples approved. |
Delivery Method | Sea, Air and Express(DHL, UPS etc) |
Pictures
Applications
for temperature sensors house